Back

Mahendra Lochhab

Content creatorย โ€ขย 4m

IIT Madras with support from the Ministry of Railways, has developed a 422-meter-long, India's first hyperloop test track. With this, 350 km can be covered in just 30min. This means you can travel from Delhi to Jaipur, roughly 300 km, in less than half an hour.

Reply
4

More like this

Recommendations from Medial

Image Description

Vivek kumar

On medialย โ€ขย 4m

IIT Madras with support from the Ministry of Railways, has developed a 422-meter-long, India's first hyperloop test track. With this, 350 km can be covered in just 30 minutes. This means you can travel from Delhi to Jaipur, roughly 300 km, in less th

See More
2 Replies
1
2

Vikas Acharya

ย โ€ขย 

Medialย โ€ขย 7m

India's First Hyperloop Test Track is Ready India's first hyperloop test track: This 410-meter long track is being built by Tarr Hyperloop in collaboration with IIT Madras. It is part of a larger 11.5 km long testing facility that is planned for the

See More
Reply
3
Image Description
Image Description

Anirudh Gupta

CA Aspirant|Content ...ย โ€ขย 1y

Meme news #4 The ministry of railways has asked it's integral coach factory to build two trains with maximum speed of 250 km/hr and running speed of 220 km/hr. These trains will be a part of vande Bharat platform with a view to increase the speed o

See More
5 Replies
10

VCGuy

Believe me, itโ€™s not...ย โ€ขย 4m

The Air mobility space (VTOL and STOL) seems to show an uptick in activity. Briefly, VTOL โ†’ Vertical Take-Off and Landing means an aircraft can lift off and land vertically without a runway. STOL โ†’ Short Take-Off and Landing refers to aircraft that

See More
Reply
11

Download the medial app to read full posts, comements and news.