Back to feeds

Mahendra Lochhab

Stealthย โ€ขย 3d

IIT Madras with support from the Ministry of Railways, has developed a 422-meter-long, India's first hyperloop test track. With this, 350 km can be covered in just 30min. This means you can travel from Delhi to Jaipur, roughly 300 km, in less than half an hour.

0 replies4 likes

More like this

Recommendations from Medial

Image Description

Vivek kumar

Stealthย โ€ขย 4d

IIT Madras with support from the Ministry of Railways, has developed a 422-meter-long, India's first hyperloop test track. With this, 350 km can be covered in just 30 minutes. This means you can travel from Delhi to Jaipur, roughly 300 km, in less th

See More
2 replies2 likes
1

Vikas Acharya

ย โ€ขย 

Medialย โ€ขย 2m

India's First Hyperloop Test Track is Ready India's first hyperloop test track: This 410-meter long track is being built by Tarr Hyperloop in collaboration with IIT Madras. It is part of a larger 11.5 km long testing facility that is planned for the

See More
0 replies3 likes
Image Description
Image Description

Anirudh Gupta

Stealthย โ€ขย 8m

Meme news #4 The ministry of railways has asked it's integral coach factory to build two trains with maximum speed of 250 km/hr and running speed of 220 km/hr. These trains will be a part of vande Bharat platform with a view to increase the speed o

See More
5 replies10 likes

Download the medial app to read full posts, comements and news.