As of July 2023, India's expressways were 5,930 km long, with 11,127.69 km under construction.

Reply
7

More like this

Recommendations from Medial

Mahendra Lochhab

Content creator • 4m

As of April 1, 2023, India's estimated coal reserves were 378.21 billion tonnes.

Reply
3

Mahendra Lochhab

Content creator • 3m

India's construction material industry is a significant sector, valued at an estimated $240 billion in 2023.

Reply
1
3

Mahendra Lochhab

Content creator • 9m

India's agricultural exports in 2022-2023 were $53.1 billion, which was 11.8% of the country's total merchandise exports.

Reply
4
Image Description
Image Description

Todays India level

Hey I am on Medial • 1y

• Merchandise exports in March 2024 were USD 41.68 Billion, as compared to USD 41.96 Billion in March 2023. • Merchandise imports in March 2024 were USD 57.28 Billion, as compared to USD 60.92 Billion i March 2023

3 Replies
8

mg

News & updates • 3m

India to launch its first indigenous semiconductor chip as five units are under construction, says Ashwini Vaishnaw.

Reply
8
Image Description

Kimiko

Startups | AI | info... • 1m

India now ranks 7th globally in annual robot installations .. Globally, there were nearly 4.3 Million operational industrial robots in 2023, with China installing 276,300 that year alone. While , India has seen the fastest annual growth in industri

See More
1 Reply
2
18

Vikas Acharya

 • 

Medial • 6m

India's First Hyperloop Test Track is Ready India's first hyperloop test track: This 410-meter long track is being built by Tarr Hyperloop in collaboration with IIT Madras. It is part of a larger 11.5 km long testing facility that is planned for the

See More
Reply
3
Image Description

Vivek kumar

On medial • 4m

IIT Madras with support from the Ministry of Railways, has developed a 422-meter-long, India's first hyperloop test track. With this, 350 km can be covered in just 30 minutes. This means you can travel from Delhi to Jaipur, roughly 300 km, in less th

See More
2 Replies
1
2

Mahendra Lochhab

Content creator • 4m

IIT Madras with support from the Ministry of Railways, has developed a 422-meter-long, India's first hyperloop test track. With this, 350 km can be covered in just 30min. This means you can travel from Delhi to Jaipur, roughly 300 km, in less than ha

See More
Reply
4

Mahendra Lochhab

Content creator • 10m

As of July 31, 2024, India's solar power installed capacity was 87.21 GW AC, making it the third largest producer of solar power in the world.

Reply